How to use this calculator
- Enter the campaign length in days.
- Enter the total number of posts you want to publish.
- Add how many days per week you can work on content.
- Estimate average production time per post.
Turn a campaign goal into a practical content calendar. Estimate daily posts, weekly workload, production hours, content pressure, and whether your plan is realistic for the team available.
The result shows whether the calendar is sustainable. A plan can look good on paper but fail if daily workload and production hours exceed team capacity.
For multi-platform campaigns, calculate once for total content, then repeat for each platform if formats require different production effort.
A 30-day campaign with 40 posts and 5 working days per week requires about 9.3 posts per week and 1.9 posts per workday. At 1.5 hours per post, production needs 60 hours.
Divide your campaign target by the number of weeks. The calculator also checks whether the weekly volume is realistic.
The best schedule depends on production capacity and audience activity. Use the calculator to balance volume with consistency.
Enter 30 days, your target post count, workdays, and hours per post to create a workload estimate.
Estimate your monthly video goal by available production time, not just desired frequency. The calculator flags overload risk.
Lower daily output, batch production, reuse formats, and leave buffer days for unexpected edits or trend-based posts.
| Module | Purpose |
|---|---|
| Auto Calendar | Converts total posts into daily and weekly output. |
| Burnout Risk | Flags excessive workload. |
| Consistency Score | Measures whether the schedule is sustainable. |
| Content Mix | Supports planning across formats and platforms. |