How to use this calculator
- Enter the measured operating data.
- Check that the displayed units match your records.
- Select Calculate to update the result.
- Review the supporting metrics before making a capacity decision.
Measure how much of a customs processing team’s available capacity is being used. Compare shipment workload with staffed processing hours and see the spare capacity or backlog implied by the current load.
Utilization below 100% leaves theoretical capacity. Above 100% means the stated work cannot be completed within the available staffed time.
This is a labor-capacity model; system outages and entry complexity should be reflected in the average minutes per entry.
180 entries at 18 minutes require 54 labor-hours. Five staff working 8 hours provide 40 hours, so utilization is 135%.
Use a period that represents normal work and keep the same start and end boundaries when comparing results.
Yes. A genuine zero is valid for optional loss or delay inputs, while required time, demand, or denominator fields must remain above zero.
Reports may use different boundaries, exclude rework or planned stops, or round intermediate values. Match those definitions before comparing figures.
Only through the averages you enter. Run separate calculations when products have materially different processing times or yields.
Recalculate after a staffing, process, routing, demand, or equipment change and use a representative sample rather than a single unusual run.
| Item | How to use it |
|---|---|
| Main result | Use for the primary planning decision described above. |
| Supporting metrics | Use them to locate the source of the result. |
| Reset | Restores the worked example values. |