Formula
Good output = (scheduled minutes × 60 × (1 − downtime) ÷ cycle seconds) × parts per cycle × (1 − scrap rate).
What the result means
The main result translates the entered injection molding operating conditions into a planning measure. Read it together with the supporting figures so a change in speed is not confused with a change in availability, quality, batch size, or demand.
Planning estimate only. Validate time studies, counts, and quality definitions against your production records before committing labor, tooling, or delivery dates.