How to use this calculator
- Enter values from one consistent operating period.
- Keep the displayed units consistent.
- Select Calculate to refresh the estimate.
- Review the secondary results before making a scheduling or process decision.
Estimate first-pass yield loss caused by failed, incorrect, or repeated tool changes. Enter attempted and successful changeovers plus an optional cost per failed attempt to calculate the failure rate, rework count, and direct loss estimate for the period.
Yield = usable output ÷ total input × 100. Yield loss = input − usable output. Loss rate = yield loss ÷ input × 100.
The main result describes the measured rate or loss for the entered operating period. Read it together with the supporting figures to avoid confusing speed, capacity, quality, and material efficiency.
This is an operational estimate. Validate input definitions against your plant records before using the result for staffing, costing, or capital decisions.
With 1,000 total units and 850 usable units, yield is 85%, loss is 150 units, and at $2.50 per unit the estimated loss value is $375.
Yes. Decimal inputs are accepted where the measured quantity or time is not a whole number.
Enter only the time excluded by the field label. Keep the measurement period consistent across all inputs.
Time, usable output, demand, or quality inputs change the denominator or effective output, so the resulting rate changes.
No. Appropriate targets depend on equipment, material, product mix, and operating conditions.
Yes. Run each period separately with the same units and definitions, then compare the displayed primary and secondary results.
| Measure | Meaning |
|---|---|
| Yield rate | A calculated output based only on the values entered above. |
| Lost amount | A calculated output based only on the values entered above. |
| Estimated loss value | A calculated output based only on the values entered above. |