Estimate rectangular earthwork cut volume from length, average width, and average depth. The calculator reports in-place bank cubic yards, cubic feet, and loose hauling volume after an optional swell factor. Use measured or surveyed dimensions for early quantity checks, truck planning, and comparisons with takeoff data; irregular grades should be divided into smaller sections for a more reliable total.

Calculator

Project inputs
ft
ft
ft
%

How to use this calculator

  1. Enter the measured project values using the units shown.
  2. Use field records or approved estimating assumptions for rates and percentages.
  3. Select Calculate and review the main result with the supporting figures.
  4. Test a second scenario before committing labor, equipment, or hauling resources.

Formula

Bank yd³ = length (ft) × width (ft) × depth (ft) ÷ 27

Loose yd³ = bank yd³ × (1 + swell percentage).

What the result means

Bank volume describes material before disturbance. Loose volume applies the entered swell factor and is the more relevant figure for temporary stockpiles or hauling capacity.

This rectangular-volume estimate does not replace a survey, cross-section takeoff, or civil model. Separate different soil types when their swell factors differ.

Example calculation

A cut 300 ft long, 40 ft wide, and 4 ft deep contains 48,000 ft³, or 1,777.78 bank yd³. With 20% swell, the estimated loose volume is 2,133.33 yd³.

Tips for better results

  • Measure quantities from the latest drawing, survey, or field record.
  • Keep bank, loose, and compacted volumes clearly labeled.
  • Record the assumptions used so the estimate can be audited later.
  • Run a conservative scenario for access, weather, and variable ground conditions.
  • Compare the estimate with actual production and update future planning rates.

Frequently asked questions

How do I calculate earthwork volume from site dimensions?

Multiply length, width, and average depth in feet, then divide cubic feet by 27 to obtain cubic yards.

Why does the calculator ask for a swell factor?

Excavated soil often occupies more volume after disturbance. Swell converts bank volume to an estimated loose hauling volume.

Should I use average depth for an uneven cut?

Use a surveyed or section-weighted average. A simple average may be unreliable where grades vary sharply.

What is the difference between bank and loose cubic yards?

Bank cubic yards describe material in place; loose cubic yards estimate its volume after excavation and expansion.

Does this estimate include over-excavation?

Only if the entered dimensions include it. Add required working space or overcut to the measured dimensions before calculating.

Inputs used in this estimate

InputPurpose
Cut lengthMeasured horizontal extent
Average cut widthAverage measured width
Average cut depthAverage vertical depth
Swell factorExpansion after excavation

Browse calculator categories

22 category hubs