Formula
Total handled = lifts × average weight + heavy lifts × added weight
Percentages are converted to decimals before the formula is applied. Intermediate values remain unrounded.
What the result means
The main result is a planning estimate for construction crane lifts. Supporting figures expose the quantity, time, capacity, or allowance behind it so the result can be checked against field records.
This calculator does not replace project specifications, engineered lift plans, approved mix designs, equipment load charts, or a site-specific safety review.