How to use this calculator
- Enter the values from your current project or work period.
- Use realistic costs and time, including unpaid or nonbillable work.
- Select Calculate to update every result.
- Change one assumption at a time to compare scenarios.
Build a defensible time cushion into a freelance project before revisions begin. Enter the planned production and revision hours, your expected rework percentage, and a delivery horizon. The result separates the contingency allowance from the planned work, then converts the combined workload into a daily target. It helps prevent revision requests from silently consuming the time reserved for other clients.
Use the main result as a planning threshold under the assumptions entered. Secondary results explain the time, rate, revenue, or cost components behind that threshold.
Estimates are for planning only. Contract terms, local tax rules, actual expenses, and working conditions may produce different results.
A 24-hour build plus 6 planned revision hours equals 30 hours. A 20% buffer adds 6 hours, producing 36 buffered hours, or 7.2 hours per day across 5 working days.
Original production hours and planned revision hours are added before the rework buffer is applied.
The selected percentage is applied to the combined production and revision time.
Buffered total hours are divided by the number of working days to show the daily workload required.
No. Enter a whole number of working days between 1 and 365.
No. It is schedule protection for rework, not a guarantee against every delay.
| Input | Meaning |
|---|---|
| Original production hours | Measured in h |
| Planned revision hours | Measured in h |
| Rework buffer | Measured in % |
| Working days until delivery | Measured in days |