Formula
Total hours = floor area × base hours per sq ft + openings × 6 hours
Crew days = total hours ÷ (crew size × 8).
What the result means
The main result summarizes the entered project scope, while the secondary figures expose the components behind it. Treat the estimate as a consistent comparison baseline and investigate any large difference between this result and a contractor proposal.
Actual requirements can change with field measurements, structural conditions, code, product instructions, disposal rules, taxes, labor practices, and the final contract scope.