Formula
Budget = [door count × (unit + installation + hardware/finish)] + permit/disposal, then × (1 + contingency rate)
What the result means
The main result summarizes the entered project scope, while the secondary figures expose the components behind it. Treat the estimate as a consistent comparison baseline and investigate any large difference between this result and a contractor proposal.
Actual requirements can change with field measurements, structural conditions, code, product instructions, disposal rules, taxes, labor practices, and the final contract scope.