#3405 · Science & Engineering Tool

Satellite Power Power Budget Calculator

Compare daily satellite energy generation with bus and payload demand. Enter beginning-of-life solar-array output, effective sunlight, conversion efficiency, eclipse duration, and loads to see whether the design closes its daily energy budget and how much array power would be needed at the stated operating profile.

Calculator

Mission inputs
W
h/day
%
W
W
h/day

How to use this calculator

  1. Enter the mission or instrument values in their stated units.
  2. Adjust margin, efficiency, or reserve assumptions to match the study case.
  3. Select Calculate to update the primary and supporting results.
  4. Compare the result with your requirement and document every assumption.

Formula

Generation = array output × sunlight × efficiency. Demand = bus load × 24 + payload load × payload duty. Balance = generation − demand. Break-even array output = demand ÷ (sunlight × efficiency).

What the result means

Treat the main result as an engineering estimate based on the stated inputs. Compare it with the applicable mission requirement and retain enough traceability to update the result when assumptions change.

This calculator supports early trade studies and does not replace mission-specific simulation, environmental analysis, or professional engineering review.

Example calculation

A 900 W array with 14.5 effective sun-hours at 82% efficiency generates 10,701 Wh/day. A 300 W bus and 450 W payload for 5 hours demand 9,450 Wh/day, leaving 1,251 Wh/day.

Tips for better results

  • Keep best-case and worst-case scenarios as separate runs.
  • Use consistent beginning-of-life or end-of-life assumptions.
  • Confirm units before copying values from another model.
  • Include only allowances that are not already embedded in an input.
  • Revisit the estimate when hardware or mission modes change.

Frequently asked questions

What assumptions does the Satellite Power Power Budget Calculator use?

It uses the values shown in the input panel and the formula stated on this page. It does not add hidden operational or environmental allowances.

Can I enter decimal values?

Yes. Decimal values are accepted within each field’s displayed range, and calculations retain precision until the result is formatted.

How should I choose the margin or reserve input?

Use a value justified by your project’s maturity, uncertainty policy, and verification plan rather than treating the default as a universal recommendation.

Does this result replace a detailed engineering model?

No. It is a first-pass estimate for trade studies. Verify the design with subsystem models, test data, and mission-specific constraints.

What happens if an input is zero?

Zero is accepted where it represents a physically meaningful absence of load, loss, background, duty, or maneuver demand. Inputs used as divisors must remain above zero.

Variables and units

ItemUse
Primary inputsEnter values in the units printed beside each field.
Margin or reserveApplied only where stated in the formula.
Displayed resultRounded for readability; internal math keeps full precision.

Browse calculator categories

22 category hubs