#2011 · Legal & Compliance Tool

Accessibility Compliance Review Capacity Calculator

Estimate how many accessibility compliance items a team can review each week and how long an existing backlog may take to clear. The model separates scheduled hours from meetings, administration, and other non-review work, then applies the observed handling time per item. Use it for staffing and workload planning, and replace the defaults with measured team data whenever possible.

Calculator

Planning assumptions
people
hr/week
min
%
items

How to use this calculator

  1. Replace the defaults with values from the applicable policy, records, and operating data.
  2. Check that every unit and reporting period is consistent.
  3. Select Calculate and review the main result plus supporting measures.
  4. Test alternative assumptions and document the scenario used for decisions.

Formula

Weekly capacity = reviewers × hours × (1 − overhead rate) × 60 ÷ minutes per review

Backlog clearance time equals backlog items divided by weekly capacity.

What the result means

The main result is sustainable weekly throughput under the entered assumptions. It is a planning capacity, not a guarantee that every case will require the same effort.

This planning estimate is not legal advice; confirm obligations, limitation periods, and enforcement rules with qualified counsel and the relevant authority.

Example calculation

With 4 reviewers, 25 hours each, 20% overhead, and 45 minutes per item, effective time is 80 hours and capacity is 106.7 items per week. A 180-item backlog takes about 1.7 weeks.

Tips for better results

  • Keep the source and date for every input.
  • Separate legal requirements from internal planning assumptions.
  • Use measured data instead of unsupported benchmarks.
  • Recalculate after material operational or regulatory changes.
  • Have the final action reviewed by the responsible compliance or legal owner.

Frequently asked questions

Can this accessibility compliance estimate replace legal advice?

No. It is a planning calculation based only on the values entered and does not determine legal obligations or outcomes.

Should I use policy values or historical operating data?

Use controlling policy or legal values for requirements and measured operating data for time, cost, probability, or workload assumptions.

How should I handle uncertain inputs?

Run separate low, expected, and high scenarios and document the source and date of every assumption.

Does the result guarantee compliance?

No. Compliance also depends on scope, controls, evidence, implementation quality, and the applicable jurisdiction or contract.

When should I recalculate the result?

Recalculate after a rule, policy, contract, workload, staffing level, cost, control, or risk assumption changes.

Variables and interpretation

VariableRole
Reviewers and hoursGross scheduled capacity
Non-review timeRemoves unavailable time
Minutes per reviewConverts hours into items

Browse calculator categories

22 category hubs