How to use this calculator
- Enter the measured operating data.
- Check that the displayed units match your records.
- Select Calculate to update the result.
- Review the supporting metrics before making a capacity decision.
Quantify rejected production as units, percentage, and material value. Include reworked units separately to distinguish first-pass yield from final good output and make quality losses easier to discuss.
Yield loss is the share that remains unusable after rework. First-pass yield separately shows how much passed without added work.
The value estimate uses material cost only and excludes labor, disposal, lost capacity, and rework cost.
From 1,000 starts, 930 pass initially and 40 are recovered. Scrap is 30 units, yield loss is 3%, and material loss at $12.50 is $375.
Use a period that represents normal work and keep the same start and end boundaries when comparing results.
Yes. A genuine zero is valid for optional loss or delay inputs, while required time, demand, or denominator fields must remain above zero.
Reports may use different boundaries, exclude rework or planned stops, or round intermediate values. Match those definitions before comparing figures.
Only through the averages you enter. Run separate calculations when products have materially different processing times or yields.
Recalculate after a staffing, process, routing, demand, or equipment change and use a representative sample rather than a single unusual run.
| Item | How to use it |
|---|---|
| Main result | Use for the primary planning decision described above. |
| Supporting metrics | Use them to locate the source of the result. |
| Reset | Restores the worked example values. |