How to use this calculator
- Enter the measured operating data.
- Check that the displayed units match your records.
- Select Calculate to update the result.
- Review the supporting metrics before making a capacity decision.
Set the required production pace for CNC demand using available machine time, planned downtime, machine count, and expected yield. Compare that takt with the current good-part cycle to identify a capacity gap.
Because scrap consumes machine time, the line must start parts faster than a simple good-demand takt suggests.
This assumes machines share comparable cycles and demand can be distributed across them.
Two machines each available 430 minutes provide 860 machine-minutes. At 96% yield, 180 good parts require 187.5 starts, giving 4.59 minutes per start.
Use a period that represents normal work and keep the same start and end boundaries when comparing results.
Yes. A genuine zero is valid for optional loss or delay inputs, while required time, demand, or denominator fields must remain above zero.
Reports may use different boundaries, exclude rework or planned stops, or round intermediate values. Match those definitions before comparing figures.
Only through the averages you enter. Run separate calculations when products have materially different processing times or yields.
Recalculate after a staffing, process, routing, demand, or equipment change and use a representative sample rather than a single unusual run.
| Item | How to use it |
|---|---|
| Main result | Use for the primary planning decision described above. |
| Supporting metrics | Use them to locate the source of the result. |
| Reset | Restores the worked example values. |