How to use this calculator
- Enter values from one consistent operating period.
- Keep the displayed units consistent.
- Select Calculate to refresh the estimate.
- Review the secondary results before making a scheduling or process decision.
Estimate how much recovered material a scrap-processing operation produces per hour and per shift. Enter the material loaded, recovery rate, operating time, and shift length to separate gross feed from usable recovered output and see how recovery losses affect practical capacity.
Usable output = feed × recovery rate; hourly throughput = usable output ÷ active hours.
The main result describes the measured rate or loss for the entered operating period. Read it together with the supporting figures to avoid confusing speed, capacity, quality, and material efficiency.
This is an operational estimate. Validate input definitions against your plant records before using the result for staffing, costing, or capital decisions.
With 800 kg loaded, an 85% recovery rate, and 8 active hours, usable output is 680 kg and throughput is 85 kg/hour.
Yes. Decimal inputs are accepted where the measured quantity or time is not a whole number.
Enter only the time excluded by the field label. Keep the measurement period consistent across all inputs.
Time, usable output, demand, or quality inputs change the denominator or effective output, so the resulting rate changes.
No. Appropriate targets depend on equipment, material, product mix, and operating conditions.
Yes. Run each period separately with the same units and definitions, then compare the displayed primary and secondary results.
| Measure | Meaning |
|---|---|
| Hourly throughput | A calculated output based only on the values entered above. |
| Projected shift output | A calculated output based only on the values entered above. |
| Unrecovered feed | A calculated output based only on the values entered above. |