How to use this calculator
- Enter values from one consistent operating period.
- Keep the displayed units consistent.
- Select Calculate to refresh the estimate.
- Review the secondary results before making a scheduling or process decision.
Measure the overall equipment effectiveness of a scrap recovery line from availability, performance, and quality. The calculator combines scheduled time, downtime, actual output, ideal rate, and recovered material that meets specification so you can see which OEE factor is holding the operation back.
Availability = run time ÷ scheduled time. Performance = total output ÷ (run time × ideal rate). Quality = good output ÷ total output. OEE = availability × performance × quality.
The main result describes the measured rate or loss for the entered operating period. Read it together with the supporting figures to avoid confusing speed, capacity, quality, and material efficiency.
This is an operational estimate. Validate input definitions against your plant records before using the result for staffing, costing, or capital decisions.
For 480 scheduled minutes, 45 minutes of downtime, a 2-unit/minute ideal rate, 780 total units, and 750 good units, OEE is 78.13%.
Yes. Decimal inputs are accepted where the measured quantity or time is not a whole number.
Enter only the time excluded by the field label. Keep the measurement period consistent across all inputs.
Time, usable output, demand, or quality inputs change the denominator or effective output, so the resulting rate changes.
No. Appropriate targets depend on equipment, material, product mix, and operating conditions.
Yes. Run each period separately with the same units and definitions, then compare the displayed primary and secondary results.
| Measure | Meaning |
|---|---|
| Availability | A calculated output based only on the values entered above. |
| Performance | A calculated output based only on the values entered above. |
| Quality | A calculated output based only on the values entered above. |