How to use this calculator
- Enter the project quantity and operating assumptions.
- Use measured project rates where available.
- Select Calculate to update the result and supporting metrics.
- Change one input at a time to compare scenarios.
Measure how quickly a steel erection crew is placing structural steel. Enter installed tonnage, crew size, shift length, and days worked to see output per crew-hour, output per worker-hour, and the daily installation rate.
Worker productivity divides installed tons by total labor-hours: crew size × shift hours × shifts.
The main result is the tonnage placed by the entire crew in one clock hour. It is best compared across periods with similar steel complexity, access, crane support, and connection scope.
This is a production estimate, not a contractual labor standard. Keep the labor scope consistent when comparing periods.
A crew installs 120 tons with 8 workers over ten 8-hour shifts. Crew productivity is 120 ÷ 80 = 1.5 tons per crew-hour. That is 12 tons per shift and 0.1875 ton per worker-hour.
Include the foreman when the foreman’s paid hours are part of the labor total used for comparison.
Yes, but every tonnage input and result must use the same tonne unit.
Only if you include the crane operator in crew size; state that choice when comparing jobs.
Enter partial shifts as decimals so their hours are included in the denominator.
Member weight, connection count, height, access, weather, and crane logistics can materially change output.
| Variable | Unit | Use |
|---|---|---|
| Installed steel | tons | Accepted tonnage placed |
| Crew time | hours × shifts | Elapsed crew production time |
| Labor input | workers × crew time | Total worker-hours |