How to use this calculator
- Enter the measured tile area.
- Use a blended installation rate that reflects tile size and layout complexity.
- Add substrate preparation time and crew size.
- Enter the hourly labor rate, then calculate.
Estimate active worker-hours, crew duration, and labor cost for interior wall painting. Paint application scales with wall area and coat count, while masking and preparation remain a separate allowance. The distinction prevents a larger crew from appearing to reduce the total amount of work.
Total labor-hours measure worker effort; elapsed hours approximate schedule length. Coat count affects application time but not the separately entered prep allowance.
Drying time between coats is calendar time and is excluded. Repairs, detailed trim, occupied rooms, and complex masking can require separate allowances.
Painting 1,200 sq ft for two coats at 180 sq ft per labor-hour takes 13.33 application hours. Adding 8 prep hours gives 21.33 labor hours. Two workers need about 10.67 elapsed hours; at $32 per labor-hour, labor is $682.67.
No. Drying time affects the calendar schedule but is not active labor unless workers perform other paid tasks during that period.
Use the separate preparation field when productivity represents paint application only. Avoid counting the same prep work twice.
Application hours increase with coat count, while the one-time preparation allowance remains unchanged in this model.
No. Crew size reduces elapsed time; labor cost is based on total worker-hours at the entered hourly rate.
Only if the productivity rate reasonably covers them. Otherwise estimate detailed trim and ceilings separately and add their labor.
| Variable | Meaning |
|---|---|
| Productivity | Finished square feet per worker-hour |
| Preparation | Total crew-hours before setting tile |
| Crew size | Workers sharing the estimated effort |