How to use this calculator
- Enter total run length and number of separate runs.
- Describe gate count and average opening width.
- Set post spacing, fence height, and picket coverage.
- Add concrete per post and a picket waste allowance.
Create an early fence material takeoff from total run length and your chosen layout. The calculator estimates sections and posts, then derives rails, pickets, concrete, and gate openings. It treats each continuous run as needing an end post, so the number of separate runs matters. Structural details, property lines, utilities, wind exposure, and local rules still require verification.
Counts are planning quantities for a simplified layout. Corners, slopes, stepped panels, double gates, bracing, and reinforced gate posts may change the order.
Locate property lines and underground utilities before digging. Verify post depth, wind design, pool-barrier rules, and permits locally.
A 200 ft, one-run, 6 ft fence with one 4 ft gate, 8 ft spacing, 5.75 in picket coverage, two bags per post, and 5% waste needs about 430 pickets, 27 posts, 75 rails, and 54 concrete bags.
A continuous line has posts at both ends; counting intervals alone omits one terminal post per separate run.
The simplified section count includes gate positions, but heavy or double gates may need additional or larger reinforced posts.
It uses two rows for fences up to four feet high and three rows above four feet as a planning assumption.
Yes, if installed picket coverage includes the actual picket face plus the planned gap.
Use it only as a starting point; stepped or racked layouts can change post, panel, rail, and cut quantities.
| Variable | Meaning |
|---|---|
| Net infill length | Total run less gate openings |
| Sections/posts | Spacing intervals plus run end posts |
| Rail rows | Two at up to 4 ft; three above 4 ft |
| Picket coverage | Installed face width plus planned gap |