Formula
Load index = tonnage ÷ 100 + hard sets × 3 + intensity × 0.8
Recovery demand = clamp(load index × sleep factor × soreness factor, 0, 100)
Sleep factor is 1 + max(0, 7 − sleep) × 0.08. Soreness factor is 1 + soreness × 0.04.
What the result means
A higher score means the session and current readiness indicators point to greater recovery demand. The time window is a planning estimate, not a guarantee that technique or tissue readiness has fully returned.
This tool does not diagnose overtraining or injury. Pain, unusual weakness, or persistent fatigue warrants qualified medical or coaching advice.