How to use this calculator
- Enter the project quantity and operating assumptions.
- Use measured project rates where available.
- Select Calculate to update the result and supporting metrics.
- Change one input at a time to compare scenarios.
Estimate the working days and calendar weeks for a timber wall framing scope. Use your own crew-day production rate, parallel crew count, workweek, and contingency to build a transparent duration allowance.
The result is a count of productive workdays. The calendar-week result uses the selected workweek but does not insert project-specific holidays or blackout dates.
The calculation assumes parallel crews can maintain the entered rate. Check material supply, floor access, inspections, and shared equipment.
For 24,000 sq ft, two crews at 960 sq ft per crew-day provide 1,920 sq ft/day. Base duration is 12.5 days; with 10% contingency the plan is 13.75 working days, or 2.75 five-day weeks.
Use the same area convention as the productivity rate; net and gross area cannot be mixed without distorting duration.
Yes. Set workdays per week to six to convert working days into planned weeks.
It adds a percentage of base productive days; it does not identify the specific cause of delay.
The decimal preserves planning detail; round according to shift scheduling and turnover needs.
Only under the formula’s assumption that both crews sustain full output without congestion or shared constraints.
| Variable | Unit | Use |
|---|---|---|
| Scope | sq ft | Remaining framed wall area |
| Crew rate | sq ft/crew-day | User-supplied productivity |
| Workweek | days/week | Calendar conversion |